Displaying report 1-1 of 1.
Reports until 16:01, Wednesday 07 February 2018
H1 General
yannick.lecoeuche@LIGO.ORG - posted 16:01, Wednesday 07 February 2018 (40459)
Shift Summary - Day

TITLE: 02/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

LOG:

16:00 (8:00) Start of shift

16:00 (8:00) Ken to Mid-Y

16:21 (8:21) Peter back from PSL enclosure

16:27 (8:27) Christina to End-X, then Mid-X

16:40 (8:40) Phil to End-X -- HEPI pump controller work

17:21 (9:21) Kyle to Mid-Y

19:06 (11:06) Travis to Optics Lab

19:11 (11:11) Travis out of Optics Lab

19:13 (11:13) Karen to Mid-Y

19:14 (11:14) Travis to LVEA

19:24 (11:24) Travis out of LVEA

19:33 (11:33) Sheila and Georgia to ISCT1

19:50 (11:50) Sheila and Georgia back from ISCT1

19:54 (11:54) Karen leaving Mid-Y

20:44 (12:44) Peter, Phil to End-X -- Beckhoff work

20:54 (12:54) Betsy and Travis to End-Y

21:03 (13:03) Patrick to End-X solar panels -- Get model numbers

21:31 (13:31) Patrick back from End-X solar panels

21:51 (13:51) Ken back from at Mid-Y, going to End-X

22:15 (14:15) Terry to SQZ Bay

23:14 (15:14) Betsy and Travis back from End-Y

23:25 (15:25) Ken back from End-X

23:39 (15:39) Nutsinee to SQZ Bay

00:00 (16:00) End of shift

Displaying report 1-1 of 1.