TITLE: 02/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
LOG:
16:00 (8:00) Start of shift
16:00 (8:00) Ken to Mid-Y
16:21 (8:21) Peter back from PSL enclosure
16:27 (8:27) Christina to End-X, then Mid-X
16:40 (8:40) Phil to End-X -- HEPI pump controller work
17:21 (9:21) Kyle to Mid-Y
19:06 (11:06) Travis to Optics Lab
19:11 (11:11) Travis out of Optics Lab
19:13 (11:13) Karen to Mid-Y
19:14 (11:14) Travis to LVEA
19:24 (11:24) Travis out of LVEA
19:33 (11:33) Sheila and Georgia to ISCT1
19:50 (11:50) Sheila and Georgia back from ISCT1
19:54 (11:54) Karen leaving Mid-Y
20:44 (12:44) Peter, Phil to End-X -- Beckhoff work
20:54 (12:54) Betsy and Travis to End-Y
21:03 (13:03) Patrick to End-X solar panels -- Get model numbers
21:31 (13:31) Patrick back from End-X solar panels
21:51 (13:51) Ken back from at Mid-Y, going to End-X
22:15 (14:15) Terry to SQZ Bay
23:14 (15:14) Betsy and Travis back from End-Y
23:25 (15:25) Ken back from End-X
23:39 (15:39) Nutsinee to SQZ Bay
00:00 (16:00) End of shift