I plan to make a check of the (3) turbo pumps in the LVEA as well as the LVEA purge-air supply (a.k.a. the "Kobelco") in the Mechanical Room. Following that, I'll be back and forth between the VPW (tweeking VBOC) and the Y-mid VEA doing work related to WP#7335. I won't be operating pwr tools, using the crane or climbing on ladders. Gerardo M. is my "phone buddy" and is aware that I am here and what I'm doing. I'll text him at 3 pm or whenever I leave whichever comes first. I'll also make a comment to this log entry when I leave.
Alarm set point is 1e-7 Torr for gauge at CP4.