Reports until 08:42, Friday 31 August 2012
H1 SEI
greg.grabeel@LIGO.ORG - posted 08:42, Friday 31 August 2012 (4048)
Unit 3 HAM purge
Unit 3 HAM had its cabling and pods removed on the 28th and was resealed in a storage container. A purge was started shortly thereafter. Interestingly the time it took to drop below -25 td°C was very similar to Unit 6 which had cabling and viton. 
Images attached to this report