Ops Day Shift Summary

TITLE: 02/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: PSL was shut down and 70W amplifier work began. More work continuing down at MY for CP4. Team SUS working on ETMY. And SQZ crew is prepping for next week's install.