TITLE: 02/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
- 1508 Bubba, Mark to LVEA to remove HAM6 S door
- 1613 Christina to LVEA
- 1633 Jeff B and Peter to PSL enclosure
- 1634 Chris and pest crew to EY, done at CS
- 1645 Fil to EX to start WP#7345
- 1646 Bubba, Mark out
- 1648 Jason to PSL enclosure
- 1701 Ed to LVEA to work on the TCS power supply
- 1701 Norco truck at gate going to 8514375
- 1701 Marc to MY
- 1704 Peter out
- 1718 Jeff K and Travis to EY to resume violin measurements
- 1730 Marc back
- 1734 Peter to PSL enclosure to drop off a tool for Jeff B
- 1736 Fil back
- 1738 Dave restarting OAF model
- 1743 Sheila, Terry to Opt Lab
- 1759 Ed out
- 1804 Betsy to EY
- 1805 Karen to MY
- 1810 Jason, Jeff B out
- 1822 Ed, Fil to CER
- 1840 Fil to EY to join the crew there
- 1852 Karen leaving MY
- 1910 Marc to CER
- 1921 Jeff K, Fil back from EY
- 1932 Marc out
- 1940 Sheila, Terry out
- 1957 DAQ reboot
- 2015 Travis and Betsy back EY
- 2101 Sheila, Terry to Opt Lab
- 2123 Ed to CER
- 2131 Marc, Richard, Fil to EX
- 2132 Travis and Betsy to EY
- 2207 Jason, Peter to PSL rack
- 2210 Nutsinee to Opt Lab then SQZ Bay
- 2221 Marc, Richard, Fil back
- 2238 Fil to CER to swap some cables for more ITMY investigation. Suspension brought to SAFE and SEI to DAMPED
- 2240 Marc to EX to repair demod chasis
- 2309 Marc back
- 2310 Nutsinee out
- 2314 Jason, Peter out
- 2325 Sheila, Terry out
- 2348 Jason, Peter ro PSL racks
- 2358 Nutinsee to SQZ Bay