Displaying report 1-1 of 1.
Reports until 12:08, Tuesday 13 February 2018
H1 PSL
jeffrey.bartlett@LIGO.ORG - posted 12:08, Tuesday 13 February 2018 (40515)
Changes to PSL Chiller Manifold
   Made several changes to PSL Chiller manifold in preparation for the 70w amplifier change. 

   (1). Disconnected the HPO Crystal Chamber circuit from the oscillator. Connected the supply to the return to make a short termination loop. Installed a throttling valve on the return side for flow control. Not happy with how the termination loop is configured. Looking into ways to improve the termination loop run.

   (2). Removed the laser head circuit. Connected the supply to the return port to keep water circulating until ready to connect the 70w. 

   (3). Removed and plugged off an unused circuit. 

   (4). Upgraded all the main manifold supply and return plastic fittings with all 316 SS. 
       
Displaying report 1-1 of 1.