Power cycle h1oaf0 in attempt to fix h1oaf overrun issue.
h1oaf0 was power cycled. The sequence was: kill models, take h1oaf0 out of the Dolphin fabric, power down cpu, power up cpu.
Note: no software was changed, no modified filter files were loaded.
The only restart issue was a brief IRIG-B negative excursion for h1iopoaf0, which invalidated the DAQ data and IPC channels for about 5 minutes.
Unfortunately, this does not fixed the h1oaf0 overrun problem (which started when h1ngn was decommissioned).
DAQ Restart
The DAQ restart was to:
use the latest H1EDCU_HEPIPUMPEX.ini
use a new H1EDCU_SEISMON.ini which I created from the new 6-eq_event code.
WP7346 Vacuum Alarms Reconfiguration
Chandra, Dave:
The cell phone alarm system was reconfigured to:
remove CP4 LN2 pump level alarms (value and error channels) from the system
increase CP4's vacuum gauge alarm level from 1.0e-07 to 5.0e-05 Torr.
The removal of CP4 LN2 pump data has impacted on the daily CP reports, which will require a code change later today.
2018_02_13 09:42 h1iopoaf0
2018_02_13 09:42 h1pemcs
2018_02_13 09:44 h1calcs
2018_02_13 09:44 h1iopoaf0
2018_02_13 09:44 h1oaf
2018_02_13 09:44 h1odcmaster
2018_02_13 09:44 h1pemcs
2018_02_13 09:44 h1susprocpi
2018_02_13 09:44 h1tcscs
2018_02_13 11:56 h1dc0
2018_02_13 11:56 h1nds1
2018_02_13 11:58 h1broadcast0
2018_02_13 11:58 h1fw0
2018_02_13 11:58 h1fw1
2018_02_13 11:58 h1fw2
2018_02_13 11:58 h1nds0
2018_02_13 11:58 h1tw1