TITLE: 02/14 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
I covered first part of shift & handed over to Patrick as I assisted with HAM6 in-vac cable work. Main activities of the day so far:
- LN2 boil-off inside MY's CP2.
- ETMy SUS binary troubleshooting
- HAM6 VOPO prep work (installing arm, in-vac cables)
LOG: (items in bold are ongoing)
- Before 16:00 - 17:40: HAM6 Arm installation starting (Bubba, Mark)
- 16:55-18:12 TJ joining crew + VOPO install prep
- 16:35 Heading to H1PSL room to continue/finish plumbing upgrade work for 70W (Jeff B)
- Oberling Heading out to H1PSL room
- 16:45 CP4 work begins (Kyle)
- 16:48 EY troubleshooting SUS Binary (Fil)
- 17:19: This brought up an "ETMy Hardware Watchdog", but Dave said this was not a "real" one.
- Also restarted Verbal to see if we get this alarm and we did get the HW & SW watchdog alarms
- 20:15 out for lunch, said they might need to reboot the IO chasis (Fil)
- 16:50-17:27 EX replace ALS WFS chasis w/ one swapped out yesterday (Mac)
- 17:00-17:18 Laser diode room work (Jason & Peter)
- 17:54-18:56 H1 PSL room to continue work (Jason & Jeff B)
- 18:27-19:21 Peter joining them
- 18:17-19:27 Working on HAM6 top cable feedthru (Hugh)
- 18:33 Topped Off Crystal chiller as PSL team was working on PSL chiller (left stopper off).
- 19:25 LVEA for dog clamps & covers (Travis)
- 20:16 SUS ETMy work continuing (Travis & Betsy)
- 20:50 Cell phone alarm work (Dave)
- 20:51 HAM6 In-Vac Cabling work (Hugh, Niko, Corey)
- 20:52 Handing Off to Patrick
Patrick covered from 20:52 - 22:45. Activities for latter part of shift: