WP 7348 -- Corey installed the Septum Window cover. Nico and Corey passed the cable ends up through the feedthru port where they were secured to the FTs which was then reinstalled. Dressed the cables across the top then down the side of the chamber. The ends are currently just hanging on Stage1.
To do -- Closeup the Feedthru gaps on the chamber top (outside.) Secure the cables to Stage0 (need some 3/8[BSC] cable clamps) followed by some more prettying up.
Also -- Remove a bunch of table top payload to make room for the OPO/ZM1 install.