daniel.sigg@LIGO.ORG - posted 16:02, Friday 16 February 2018 (40588)
ISCT6 Moved

Corey Terry Nutsinee Daniel

We moved ISCT6 from the squeezer bay close to its final position next to HAM6. To allow for work in the chamber the table is positioned about 1m back from its final position and outside the clean room. All three rear panels have been replaced with temporary blanks. The panel on the left will have to be swapped back with panel 1 eventually to get the AISAIR beam path onto the table. Still to do: Drill mounting holes into two new blank rear panels.