TITLE: 02/20 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 7mph Gusts, 5mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.19 μm/s
QUICK SUMMARY:
ISI config is in Large EQ mode since Friday Feb 16th. I will leave it this way until Jim gets here. Work being done at both ends so BRS turned of seems like a good way to let it be fo now.
PSL is tripped