hugh.radkins@LIGO.ORG - posted 15:49, Tuesday 20 February 2018 (40613)
WHAM6 OPO/SQZ cables on C1 Adapter complete

Under WP 7348, last week, Corey and Nico help connect these cables to the C1 (top of chamber) conflat feedthrus.  The cables are now available for routing onto the table to the OPO & SQZ.  They are hanging on the SW side of the ISI.  They are labeled with ClassB metal tags and these should be removed after connecting.  They are labeled just as the In-Air side of the Feedthru is labeled, see attached photo and can be determined from D1300122 Sheet 8.  For example, C1-2C1 is the ZM1 Tip/Tilt BOSEMs.

The feedthru has been clamped metal to metal on the air side.  It has not been vacuum tested.  WP 7348 is closed.  WP 7341 (Septum Cover Install) remains open.