TITLE: 02/22 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 15:49 UTC Kingsoft water through gate to service RO 16:07 UTC Bubba to LVEA to prep for removing BSC1 door, craning engine hoist 16:08 - 16:16 UTC Hugh to LVEA to retrieve tools, then to end X to lock HEPI 16:14 UTC Peter and Carlos to PSL enclosure 16:32 UTC ISI ITMY stage 2 WD tripped (craning engine hoist into beir garten on camera) 16:39 UTC Corey to LVEA to install posts on top of in air tables 16:48 UTC High dust alarm at end X 16:56 UTC BSC1 north door being removed 16:56 UTC HEPI ETMX WD tripped 16:58 UTC Jason to PSL enclosure to join Peter (WP 7366) 16:59 UTC Betsy to LVEA (BSC1) 17:03 UTC ISI EMTX stage 2 WD tripped 17:15 UTC Travis to end Y to remove cover from ETMY 17:16 - 17:22 UTC TJ to LVEA to retrieve tote of parts 17:21 UTC Jason and Peter back 17:31 UTC Gerardo to BSC1 17:31 UTC ISI ETMY stage 2 WD tripped, SUS TMSY WD tripped 17:33 UTC TCSX CO2 laser off 17:34 UTC Alvaro to optics lab 17:34 UTC TCSY CO2 laser off 17:37 UTC Nutsinee to ISCT6 17:38 UTC Kyle and Bubba removing BSC1 north door, Betsy has turned off CO2 lasers and removed keys 17:39 UTC Hugh back, end X HEPI is locked 17:42 UTC ISI ITMY stage 1 WD tripped 17:44 UTC Jeff K. to LVEA to talk to Betsy 17:49 UTC Travis done 17:51 UTC Sheila, Georgia and Jim to end Y, WP 7365 17:52 UTC ITMY HW WD tripping 18:07 UTC Travis to LVEA 18:12 UTC Filiberto at end Y, retrieving high voltage tester, fixing cable 18:12 UTC TJ to LVEA to retrieve part and then to optics lab to work with Alvaro 18:19 UTC Travis back 18:27 UTC Corey to end Y 18:30 UTC Marc to LVEA to check on squeezer equipment 18:40 UTC Marc back 18:40 UTC Ed to SQZ racks by HAM6 to shorten cables 18:46 UTC Keita transitioning end Y to laser hazard 18:56 UTC Filiberto back 19:14 UTC Filiberto to BSC1 for HV testing 19:15 UTC end Y is laser hazard 19:17 UTC Marc retrieving cable from LVEA 19:34 UTC Jeff, Filiberto, Betsy back. Kyle and Bubba putting door back on 19:39 UTC Columbia Center Engineering through gate 19:54 UTC Corey done at both end stations. Going to LVEA to put equipment back. 19:55 - 20:02 UTC Travis to LVEA 19:59 UTC Nutsinee back 20:02 UTC Mike F. and Matt H. to PSL enclosure 20:08 UTC Corey out of LVEA 20:17 UTC Keita back 20:19 UTC Jason to PSL enclosure 20:29 UTC TJ and Alvaro out 20:31 UTC Jeff K. measuring ITMY 21:09 UTC Georgia, Sheila and Jim back 21:14 UTC Took ITMY SUS to safe. Filiberto to BSC1 to pull cables 21:45 UTC Filiberto back 21:47 UTC Peter back 21:51 UTC TJ and Alvaro to optics lab 22:04 UTC Keita and Georgia to end Y 22:12 UTC Filiberto back to LVEA to check for short at feedthru 22:19 UTC Gerardo to mid Y 22:33 UTC Filiberto back 23:00 UTC Siteweekly meeting 23:58 UTC Jason and Matt done in PSL for day 00:04 UTC Betsy turning CO2 lasers back on, returning keys 00:04 UTC Jeff. B. back from PSL