Vertex volume ready pump down
Bubba, Gerardo, Kyle 

We removed BSC1's North Door for Betsy W. and re-installed after she completed her in-chamber work.  We are pumping BSC1's annulus with a small turbo backed by a leak detector overnight.  We expect to helium leak test the door in the morning followed by submission of a WP to pump down the Vertex Volume.  
Comments related to this report
gerardo.moreno@LIGO.ORG - 17:21, Wednesday 21 February 2018 (40650)

Torqued the two flanges that were removed, F2-3 and F3-1.  Leak testing needs to be done for both.