Framing is erected and most of the insulation pads are up. Need to work out some bugs in the electrical. Reworked a few areas of strut interference. Designer will create as-built drawings. Thanks everyone for your help today: Ken, Mark, Richard. Tomorrow we resume.
We have an adapter cable to swap CP4's pressure reading from PT-245B to the {temporary} full range hot cathode gauge installed on turbo inlet, since we'll lose PT-245B (electronics) in the heat. Patrick T. is working on software code for this swap. Thanks!