Displaying report 1-1 of 1.
Reports until 15:22, Friday 23 February 2018
H1 TCS
filiberto.clara@LIGO.ORG - posted 15:22, Friday 23 February 2018 (40689)
SR3 Heater Driver Chassis

Completed in-rack cabling for the SR3 Heater Chassis D1700493 in the CER. Power, ADC, and DAC cables are now connected. The field cabling to the chamber (thermocouples and heater cable) were left disconnected. Chamber side is still missing connector for vacuum feed-through.

Displaying report 1-1 of 1.