TITLE: 02/23 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 15:52 UTC Terry to LVEA to work on squeezer table 16:24 UTC Nutsinee to ISCT6 16:53 UTC Ed to end X, Filiberto to ISCT6 (Beckhoff safety) 17:01 UTC Filiberto done 17:06 UTC Gerardo to LVEA to unpause pumping of vertex 17:06 UTC Ed starting work at end X 17:11 UTC Peter to chiller/diode room for documentation 17:13 UTC Ed to end Y 17:28 UTC Ed starting work at end Y 17:32 UTC Ed done, heading back 17:39 UTC Peter done 17:41 UTC Marc to mid Y to drop off and receive parts 18:07 UTC Marc back 18:08 UTC Georgia to end Y, taking electric field measurements with grounded battery pack 18:20 UTC Jason to PSL enclosure 18:25 UTC Alvaro to optics lab 18:26 UTC Betsy and Travis to end Y to realign ETMY 18:33 UTC Ed to PSL enclosure 18:40 UTC TJ to optics lab 19:35 UTC Georgia back 19:47 UTC Filiberto to LVEA to install safety relay for SQZ laser interlock 20:08 UTC Betsy and Travis back 20:09 UTC TJ back 20:20 UTC Sheila to optics lab 20:30 UTC Ed and Jason back 20:31 UTC Sheila back 20:31 UTC Nutsinee back 20:53 UTC Travis and Betsy to end Y 21:01 UTC Richard to LVEA 21:10 UTC Alvaro back from optics lab 21:29 UTC Jason and Ed to PSL enclosure 21:44 UTC Peter to PSL enclosure 21:44 UTC Nutsinee to ISCT6 21:56 UTC Greg to LVEA to turn on TCS laser power supplies 22:04 UTC Filiberto to CER 22:09 UTC Greg back 22:10 UTC Alvaro to optics lab 22:15 UTC Mark to mid Y 22:42 UTC Gerardo to mid Y to connect Inficon gauge to ADC for PT-245 22:48 UTC Filiberto done 23:43 UTC Ed back 00:09 UTC Betsy and Travis back
Late entry.
Pump down of the vertex was restarted today at 17:10 utc.