TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Cheryl out sick, so her shift is being covered by multiple people (I covered morning & Patrick/Jeff will also help with coverage).
LOG:
- 15:51-15:59 Mark D at EY. --DONE
- 15:47 Reset Dust #10 in LVEA (Jeff) --DONE
- 16:10 Ken to EX for Access System work, may cause access system alarms
- 16:25 Getting tools from H2 PSL room (Rick) --DONE
- 16:38 Looking for parts in LVEA (TJ) --DONE
- 17:35 EY stuff to EX all day (both Marks)
- 17:45 Transitioning LVEA to Laser SAFE (Bartlett)
- 18:06 CP4 work (Chandra)
- 18:06 Connecting HAM6 VOPO In-air cables to the roof flange (Hugh)
- 18:10 VOPO prep in Optics Lab (TJ, Alvaro)