TITLE: 02/26 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 12mph Gusts, 8mph 5min avg
Primary useism: 0.25 μm/s
Secondary useism: 0.51 μm/s
QUICK SUMMARY:
LVEA continues to be Laser HAZARD.
VOPO install at HAM6 is on the docket for today.