Status
- Corner Vent pressure good--HAM6 VOPO work should be good to go.
- Can transition to Laser SAFE (Bartlett)
- Discussing HAM6 fiber feedthru flange (Gerardo needs to receive paperwork)
- PSL work continues
LVEA: VOPO Install (Corey, TJ, Alvaro with Bubba observing). And then fine tuning rest of the week. Might need beam/laser HAZARD Wed.
EX: Vented, IP12 removal (Tues), door off (wed/later?), Arm install (later in week)
EY: PCal work beginning of the week, ground loop checks, elec field measurements later in week, Vacuum install tasks next week
MY: CP4 Bakeout start this week sometime
Tues Maint:
- ISI model boots,
- framewriter work,
SQZ model update,
- DAQ boot,
- Beckhoff SDF (hanks),
- Redundant trend writers (hanks),
- Tues Operator be on look out for any issues which could affect alignment from these bootfests...want to be ready for HAM6 alignment later this week.
- Corner station HEPI maintenance,
Safety:
- IR only glasses use at EY for PCal. This is a waived and rare occasion. Rick & Peter talked about it. (Mike L)
- Want to be good with housekeeping! (Bubb)
- Do not leave in-air optical table doors open if you are leaving table unattended--even if we are Laser HAZARD. (Peter)