Displaying report 1-1 of 1.
Reports until 14:33, Tuesday 27 February 2018
H1 CDS (DAQ)
david.barker@LIGO.ORG - posted 14:33, Tuesday 27 February 2018 - last comment - 15:54, Tuesday 27 February 2018(40745)
CDS maintenace summary

WP7381 Oaf testing prior to ISI common motion upgrade

Dave:

It looks like I've fixed the over-run of h1oaf by moving h1tcscs to fill the core vacated by h1ngn. I'll post details in an alog.

Stopping h1tcscs reminded us of the CO2 laser chiller issue when the setpoint temperature control voltage goes to zero. Fil wired up the chiller summation box which should resolve this issue, but we found that ITMY's water temp increased when h1tcscs was restarted. It had reached 26C when Fil removed the summation box from the control circuit. More details in another alog.

WP7378 OS upgrade for Scientific Linux Machines

Greg:

Greg updated and rebooted the DMT SL7.4 production machines (h1dtm[0,1,3]). He also upgrade h1hwinj2 from 7.3 to 7.4. h1hwinj1 is actually running 6.9 and its upgrade is not simple. We will most probably go ahead and re-install SL on this box next week.

WP7376,WP7377 Replace h1tw0 with new computer

Jonathan, Dave, Carlos:

 Other issues this morning has pushed this activity to another time.

WP7319 new beckhoff SDF code

Jonathan:

All Beckhoff SDF systems were restarted other than C1PLC4 which had been upgraded some weeks ago.

WP7380 New SQZ model, add Guardian EPICS channels

Sheila, Dave:

h1sqz model was rebuild with LLO's latest SQZ_MASTER.mdl.

Complete renaming of VOPO to OPO

Jeff K, Dave:

Jeff modified h1susauxh56.mdl to complete the renaming of VOPO to OPO.

DAQ Restarts

Dave:

DAQ was restarted twice. First for h1sqz changes. Second for h1susauxh56 change.

 

Comments related to this report
david.barker@LIGO.ORG - 15:54, Tuesday 27 February 2018 (40753)

Restart log is attached

Non-image files attached to this comment
Displaying report 1-1 of 1.