Summary:
TImeline:
Feb 27 2018 15:25:45 UTC ChrisS to all out buildings for FAMIS/Maint.: fire ext. charging lifts
Feb 27 2018 15:53:09 UTC Mark and Mark to LVEA to get hoist and move to MY
Feb 27 2018 16:11:41 UTC JeffB to LVEA looking for parts
Feb 27 2018 16:12:26 UTC Peter in PSL, Jason heading out to PSL
Feb 27 2018 16:20:07 UTC Hugh to LVEA for fit check for LLO
Feb 27 2018 16:24:28 UTC Ed to PSL
Feb 27 2018 16:36:23 UTC Mark and Mark to all out buildings and CS
Feb 27 2018 16:37:02 UTC - EY: removing ion pump, craning arm to move to EX
Feb 27 2018 16:37:28 UTC - MY: retrieving forklift, taking to EY
Feb 27 2018 16:38:00 UTC - EY craning arm and taking to EX
Feb 27 2018 16:38:38 UTC - EY: snorkel to MX
Feb 27 2018 16:39:03 UTC LN delivery
Feb 27 2018 16:40:04 UTC Richard to LVEA H2 enclosure area
Feb 27 2018 16:41:46 UTC Hugh back from LVEA, starting WP7371, HEPI maintenance
Feb 27 2018 16:48:33 UTC Hugh heading to LVEA to complete HEPI Maint.
Feb 27 2018 16:49:40 UTC JeffB back from EX
Feb 27 2018 16:49:52 UTC Richard back from LVEA
Feb 27 2018 16:51:39 UTC Rick, Jim, Niko, Stephen, Alena to EY to work on PSL baffle
Feb 27 2018 16:55:46 UTC Sheila to optics lab, SQZR bay, and HAM6 gathering parts, working outside of HAM6
Feb 27 2018 16:56:41 UTC Fil to LVEA to pull a cable from the PSL to HAM5/6, will be climbing on HAM5 chamber
Feb 27 2018 17:03:40 UTC Ken to EX, will need to power down FMCS system to work, and he and Bubba will restore, expect FMCS alarms
Feb 27 2018 17:04:15 UTC Richard and Peter to LVEA H2 PSL area
Feb 27 2018 17:14:56 UTC Gerardo to EX for ion pump removal, working with Mark and Mark
Feb 27 2018 17:15:54 UTC Jonathan SDF: reinstalling slow controls, impact should be limited to medm going white, no expected other interactions
Feb 27 2018 17:29:06 UTC Nutsinee and Terry to SQZR bay
Feb 27 2018 17:31:31 UTC ISI HAM3 watchdog tripped
Feb 27 2018 17:35:22 UTC Richard out of LVEA
Feb 27 2018 17:35:45 UTC Peter working with Fil on cable pull for temp. interlock
Feb 27 2018 17:39:12 UTC JeffK and Alvero into LVEA to work in HAM6
Feb 27 2018 17:52:02 UTC Betsy to TCS chillers to check on coolant level after a couple TCSY chiller flow alarms
Feb 27 2018 17:54:58 UTC DaveB starting work on WP7381 OAF restart to add RFM channels
Feb 27 2018 17:55:42 UTC DaveB restarting SQZR front end to add channels
Feb 27 2018 17:57:14 UTC Peter out of LVEA
Feb 27 2018 17:58:00 UTC Betsy back from TCS chillers, all are OK
Feb 27 2018 17:58:18 UTC ChrisS done at all outbuildings, heading into LVEA
Feb 27 2018 18:02:47 UTC Sheila and TJ to optics lab then TJ to HAM6
Feb 27 2018 18:12:09 UTC Richard to LVEA
Feb 27 2018 18:10:38 UTC Paradise water through gate
Feb 27 2018 18:18:08 UTC second LN2 delivery
Feb 27 2018 18:22:35 UTC Mike taking guest through LVEA
Feb 27 2018 18:24:42 UTC Centas (mat contractor) through gate
Feb 27 2018 18:35:19 UTC talked with DaveB about TCS chiller alarms from OAF being down
Feb 27 2018 18:35:52 UTC TCS chiller sees a request of 0 deg
Feb 27 2018 18:36:19 UTC DaveB and Patrick and I talking about TCS chillers
Feb 27 2018 18:36:47 UTC timing system error - DaveB and Daniel looking into it
Feb 27 2018 18:37:36 UTC Jonathan finished restarting SDF
Feb 27 2018 18:38:25 UTC Greg starting on DMT patch
Feb 27 2018 18:40:22 UTC I could not get the Seismic DMT to run, rebooted Nuc5, DaveB looking into it
Feb 27 2018 18:42:51 UTC Betsy to Cleaning area for supplies
Feb 27 2018 18:52:40 UTC Mike and guest done in LVEA
Feb 27 2018 19:01:39 UTC TCSY laser is off, hardware to prevent a request of 0deg being sent to the chiller is installed
Feb 27 2018 19:18:12 UTC Besty done collecting supplies
Feb 27 2018 19:26:36 UTC ETMX HEPI tripped, will restore by the end of the day
Feb 27 2018 19:29:56 UTC cleared the watchdog on ETMX HEPI, STS X still railed at -32K, waiting in READY
Feb 27 2018 19:31:08 UTC HUGH done with HEPI, WP7371
Feb 27 2018 19:45:25 UTC Mark Mark and Gerardo done with ion pump removal at EX
Feb 27 2018 19:48:51 UTC Fil done connecting hardware to limit temperature request to TCS chillers when OAF is not on (sending zeros)
Feb 27 2018 19:53:15 UTC Rick to EY
Feb 27 2018 19:53:27 UTC Jason and Ed out of PSL
Feb 27 2018 19:54:37 UTC JeffB and Alvero out of HAM6, will test suspension
Feb 27 2018 20:04:14 UTC DaveB restarting SQZR and DAQ
Feb 27 2018 20:23:25 UTC Sheila to optics lab
Feb 27 2018 20:23:39 UTC TJ out of HAM6
Feb 27 2018 20:28:52 UTC JeffK WP7382 - ongoing
Feb 27 2018 20:29:59 UTC DaveB WP7381 - RFM and OAF - ongoing
Feb 27 2018 20:30:42 UTC Jonathan WP7377 - install h1tw0 - ongoing
Feb 27 2018 20:31:24 UTC Jonathan WP7376 - remove olf h1tw0 - ongoing
Feb 27 2018 20:31:54 UTC Greg WP7378 - DMT - ongoing
Feb 27 2018 20:32:51 UTC Sheila WP7380 - SQZ RCG model - ongoing
Feb 27 2018 20:33:31 UTC Hugh WP7372 - SEI HEPI BSC2 recenter - ongoing
Feb 27 2018 20:34:46 UTC Hugh WP7371 - complete
Feb 27 2018 20:46:23 UTC Sheila WP7380 - SQZ RCG model - complete
Feb 27 2018 20:51:53 UTC WP7372 Hugh starting, taking BS HEPI and ISI offline
Feb 27 2018 21:03:02 UTC DaveB OAF back up and running
Feb 27 2018 21:12:40 UTC Chandra to MY
Feb 27 2018 21:13:01 UTC MCE engineer through the gate heading to MY
Feb 27 2018 21:30:25 UTC Rick and Stephen back to EY
Feb 27 2018 21:31:12 UTC Jim, Niko, and Alena back to CS, then returning to EY
Feb 27 2018 21:51:37 UTC Fil pulling the TCS chiller setpoint box, unclear what its doing, but clear that it didn't work
Feb 27 2018 21:57:34 UTC 7382 DaveB DAQ restart for JeffK work permit
Feb 27 2018 21:59:49 UTC Nutsinee out from LVEA
Feb 27 2018 22:16:59 UTC DaveB noticed EY ISC is dead, calling EY
Feb 27 2018 22:27:40 UTC glitch in communication - sending TJ to EY
Feb 27 2018 22:47:33 UTC Corey to EY to get First Contact
Feb 27 2018 22:48:32 UTC DaveB EY ISC is back, physical contact with rack wires confirmed
Feb 27 2018 22:48:55 UTC Nutsinee out to SQZ bay
Feb 27 2018 22:49:19 UTC Hugh out of LVEA, work continues from CR
Feb 27 2018 22:52:38 UTC Sheila Alvero and TJ in the LVEA working in/around HAM6
Feb 27 2018 22:54:02 UTC Sheila also heading to optics lab and SQZ bay
Feb 27 2018 23:21:37 UTC Jason and Ed out of PSL
Feb 27 2018 23:21:45 UTC Corey back from EY
Feb 27 2018 23:36:37 UTC Matt and guest to LVEA and roof
Feb 28 2018 00:01:03 UTC Mark and Mark done for today
Feb 28 2018 00:11:37 UTC still working in outbuildings
Feb 28 2018 00:11:58 UTC - Chandra and MCE at MY
Feb 28 2018 00:13:15 UTC - Rick, Stephen, Jim, Niko, Alena at EY
Feb 28 2018 00:14:01 UTC Matt and guest out of LVEA