TITLE: 03/01 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
CP4 Bakeout begins, HAM6 Squeezer work continues, EY Pcal work completed, EY TMS checked.
LVEA is Laser HAZARD now & EY is back to SAFE.
LOG: (All times UTC)
- 16:03 Resetting EY Dust Monitor (Jeff B.)
- 16:08 MY--CP4 Bakeout will be beginning at 16:30, may get alarms (Chandra)
- 16:16 Moving snorkel from MX to MY, for MY electrical/camera work by Ken (M&M)
- 16:50 EY--PCal alignment work for the day begins (Rick, Travis, Niko, Marek, Dennis)
- 17:05 EX--Moving legs of Test Stand out of the way at EX (M&M)
- 17:21 HAM6--ZM1 & beam diverter work (TJ)
- 17:42 PSL work (Jason, Ed)
- 17:58 Matt joining
- 22:25 Continuing work
Patrick coverage from 18:00-19:00
- 18:05 Rick called to say EY is laser hazard
- 18:07 Dave tried to add reservation and crashed reservation code. I restarted display on nuc2. Display on video4 needs restarting.
- 18:19 Betsy to end X to move furniture
- 18:33 Well testing company through gate
- 18:36 Tour leaving CR
- 19:44 EY Laser SAFE
- 19:45 Laser safety hardware work in LVEA (will kill lasers...i.e. at EY)
- 19:47 Turned OFF TCS x & y lasers (Corey for Richard)
- 21:38 Cabling for Chiller summing chassis in CER (Dave & Fil)
- 21:38 Squeezer Table cabling (Fil)
- 21:50 Continuing HAM6 work (TJ, joined by Sheila, Nutsinee, Terry)
- 21:58 LVEA being transferred to Laser Hazard (Sheila)
- 21:53-23:09 EY TMS work (Georgia, Keita)
- Also transitioning to Laser Hazard/Safe
- Cheryl noticed Y3_PT210B_PRESS_TORR slowly increasing on Wall TV (video0); usually these are flat. Gerardo consulted, he said it was due to the temperature increase.
- 22:09 Guardian work for HAM2, BS, ITMy (Jamie)
- 22:11 Increase transimpedance for OPO Trans DCPD (Marc)
- 23:36 EY TMS transfer functions (Betsy)