Overall: EY, HAM6, & PSL work looking good
HAM6:
- TT testing, cabling work, and then would like to go to laser hazard tonight/morning (will stay hazard for a while).
- NOTE: If you can avoid walking around HAM6 this would be good, it's a congested area & there will be an IR laser in operation there.).
- Work on making a work platform on south side of chamber.
- Possibly ready for beam mid-next week (so need covers off Septum window).
- "VOPO might be rubbing," Jeff K.
- Will need viewport simulator.
EY:
- Today: TMS Check (Keita & Georgia)
- Tomorrow: B&K (Jeff K, Jim), Ground loop checks (Fil)
EX (Next Week)
- ALS/PCal Lock & Tag Out
- Door off Monday
- Need to be thoughtful of visits to EY & limit traffic there.
Guardian work ongoing, so will be going up & down. (Jamie)
HVAC Work in OSB Labs slated for next week. Need to cover optics tables for this work (Corey).