Reports until 16:28, Friday 02 March 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:28, Friday 02 March 2018 - last comment - 17:41, Friday 02 March 2018(40811)
Ops Shift Summary
TITLE: 03/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

Jeff K. and Jim running B&K measurements of PCAL at end Y

16:27 UTC Corey to ISCT6 to fix door handle
16:39 UTC Sheila to optics lab to cover equipment in prep for facilities work
16:51 UTC Corey to optics lab to cover equipment in prep for facilities work
16:59 UTC Jeff K. and Jim back from end Y
17:09 UTC Jason and Ed to PSL enclosure
17:19 UTC Terry to ISCT6 to work on beam path
17:25 UTC Rick to end X to put lock and tag on PCAL laser in prep for vent
17:31 UTC Travis to end Y, in chamber work
17:49 UTC Chandra to mid Y
17:54 UTC Karen at mid Y
18:00 UTC Karen leaving mid Y to retrieve vacuum from corner station
18:17 UTC Karen back at mid Y
18:24 UTC Sheila and Corey out of optics lab
18:24 UTC Travis back from end Y
18:31 UTC Marc to LVEA for cosmic ray testing
18:31 UTC Nutsinee to ISCT6
18:50 UTC Matt H. to PSL
19:05 UTC Karen leaving mid Y
19:11 UTC Signed WP 7395. Sheila making model changes, no restarts
19:36 UTC Nutsinee back
19:38 UTC Tumbleweed thrashing near corner station
20:02 UTC Delivery from Apollo
20:02 UTC Jeff K. to optics lab
22:09 UTC Matt H., Ed and Jason out of PSL enclosure for lunch
20:10 UTC Jeff K. out of optics lab
20:55 UTC TJ and Travis to HAM6
21:08 UTC Marc and Elizabeth to LVEA to work on cosmic ray
21:15 UTC Sheila to LVEA to look for headsets
21:18 UTC Ed and Jason to PSL enclosure
21:23 UTC Sheila to end Y to look for headsets
21:23 UTC Matt H. to PSL enclosure
21:24 UTC TJ and Travis out of HAM6
21:32 UTC Marc and Elizabeth back
21:44 UTC Filiberto and Elizabeth to end Y for SUS ground loop checking, then pulling fiber from patch panel in VEA to fan room for access control system
21:48 UTC Sheila back
21:54 UTC Hugh and Mark to LVEA
21:57 UTC Sheila to HAM6 to install fibers
22:00 UTC Nutsinee to find Sheila in LVEA
22:10 UTC Travis moving equipment from end Y to end X
23:07 UTC Travis back
23:24 UTC Greg leading tour into CR
23:36 UTC Greg leading tour out of CR to overpass
00:10 UTC Cheryl to PSL enclosure, WP 7393
00:24 UTC Filiberto and Elizabeth back
Comments related to this report
patrick.thomas@LIGO.ORG - 17:28, Friday 02 March 2018 (40819)
01:28 UTC Cheryl back
patrick.thomas@LIGO.ORG - 17:41, Friday 02 March 2018 (40820)
01:41 UTC Matt H., Ed and Jason out of the PSL enclosure