Displaying report 1-1 of 1.
Reports until 22:33, Friday 02 March 2018
H1 PSL (IOO, PSL)
cheryl.vorvick@LIGO.ORG - posted 22:33, Friday 02 March 2018 (40822)
corrections made to the PMC dog clamps

I modified the dog clamps on 3 of the 4 PMC feet that hold the PMC to the PSL table.  The 4th foot attachment point is located between the ISS and the PMC, and will be addressed at a later date.

For 3 of the 4 feet:

- Cheryl, Matt, Ed

Images attached to this report
Displaying report 1-1 of 1.