Displaying report 1-1 of 1.
Reports until 18:33, Friday 02 March 2018
H1 SQZ
sheila.dwyer@LIGO.ORG - posted 18:33, Friday 02 March 2018 (40823)
green long fiber installed

Terry, Sheila, Nutsinee, Daniel

This afternoon there was a lot of work around HAM6, Terry got a beatnote for the FSS using our temporary laser, Daniel swapped in vac cables (480818), and we installed the new long green fiber that we received from MIT today.  

We are getting about 50% transmission from the fiber.  Before installing it Terry inspected both ends of the fiber using the fiber microscope.  We used only 2.7mW into the fiber. 

Displaying report 1-1 of 1.