Reports until 16:00, Monday 05 March 2018
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Monday 05 March 2018 (40845)
Ops Day Shift Summary
Ops Shift Log: 03/05/2018, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Vent work wrapping up at End-Y and ramping up at End-X  
 
Activity Log: Time - UTC (PT)
15:11 (07:11) Door Crew – Removing BSC-9 Door & Installing arm
16:00 (08:00) Start of Shift
16:40 (08:40) APS on site to see Richard
17:21 (09:21) Jason – Going to End-X to center OpLev
17:35 (09:35) Hugh – Going to HAM6 to recover equipment
17:46 (09:46) Hugh – Out of the LVEA
18:03 (10:03) Jason – Back from End-X
18:15 (10:15) Richard – Taking a contractor tour into the LVEA
18:23 (10:23) Filiberto – Pulling network cable from CEP to SUS-R4 (WP #7398)
18:34 (10:34) TJ – Going to HAM6
18:39 (10:39) Jason – Going into LVEA to check on ITMs OpLev status
18:40 (10:40) Richard – Finished with contractors tour and is out of the LVEA
18:41 (10:41) Jason – Out of the LVEA
18:54 (10:54) Ken – Going to End-Y to install conduit
19:06 (11:06) Sheila – Going to HAM6 for fiber and cable work
19:10 (11:10) Door Crew finished at End-X – Door is off and Arm is on
19:12 (11:12) Nutsinee – Going into the Optics Lab
19:15 (11:15) Terry – Going to HAM6 area to work on fiber/cabling work
19:23 (11:23) Hugh – Going to HAM6 to assist with cabling/fiber work
19:23 (11:23) Jim – Going to End-X to lock the ISI
19:30 (11:30) Joel on site to see Bubba
19:33 (11:33) Hugh – Out of the LVEA
19:38 (11:38) Jason – Going into the PSL enclosure for work on 70W install
19:49 (11:49) Nutsinee – Out of the Optics Lab
19:55 (11:55) TJ – Out of the LVEA
20:05 (12:05) Karen – Finished cleaning the out buildings and is coming back to OSB
20:12 (12:12) Jason – Out of the PSL enclosure
20:42 (12:42) Richard – Going to End-Y
21:05 (13:05) Nutsinee – Going to HAM5/6 area
21:55 (13:55) Elizabeth – Going to both end stations to do hazard zone marking
22:03 (14:03) Corey – Gong to HAM6 to make some measurements
22:39 (14:39) Corey – Out of the LVEA
22:53 (14:53) Hugh – Going to HAM6
23:00 (15:00) TJ – Going back to HAM6
23:44 (15:44) Elizabeth – Back from end stations
00:00 (16:00) End of Shift