Reports until 09:06, Wednesday 05 September 2012
H1 SEI
greg.grabeel@LIGO.ORG - posted 09:06, Wednesday 05 September 2012 (4086)
Unit 7 HAM purge
Purged Unit 7 in its storage container with LN2 boil off from a dewar. Used 5 Liters per Minute flow rate this time and the differences can be seen in the attached chart. I would like to try and find the minimum flow rate needed to maintain a -35 to -40 tdºC dew point level, but I may need to get a lower flow rotameter. 
Images attached to this report