Terry, Sheila, TJ, Nico, Corey
After TJ's suspension work this morning Nico and Corey helped us install the viewport simulator and move SQZT6 a few inches to the west. Terry and I aligned the 1064 and 532 refl paths through the viewport simulator and adjusted the periscopes on SQZT6 so that both beams are on the table. Terry alinged the green REFL path all the way towards the 1801 which is our temporary REFL PD.
We tried to drive the OPO PZT, now that we think the cabling in chamber is correct, but we were not able to drive the PZT. We also need a power cable for the 532 REFL diode.
Our next steps are to look for a PDH signal out of the 532 refl diode and to attempt to align the SQZ beam to the 2 apperatures while scanning the OPO.