Reports until 16:00, Thursday 08 March 2018
H1 General
Link
cheryl.vorvick@LIGO.ORG -
posted 16:00, Thursday 08 March 2018
(40914)
Shift Summary:
08-03-18 15:48 JeffB in optics lab
08-03-18 16:01 Bubbas contractor for pump room work arrived - red truck
08-03-18 16:09 Richard to CER
08-03-18 16:49 Terry to HAM6, ISCT6
08-03-18 16:49 Richards contractor for the card access system arrived
08-03-18 17:14 JeffB done in optics lab and cleaning area
08-03-18 17:17 Karen done with cleaning at EY
08-03-18 17:18 Christina done with cleaning EX
08-03-18 17:18 Ken at EY for card access work
08-03-18 17:50 Richards card access contractor at EX and MX today
08-03-18 17:56 Mark to CER for cosmic ray equipment
08-03-18 17:56 Niko to HAM6
08-03-18 17:57 Dave looking at python error on verbal alarm machine
08-03-18 18:01 Sheila to optics lab and HAM6
08-03-18 18:10 as of 18:10 we are having an earthquake and also moving guardian nodes
08-03-18 18:11 many guardian nodes are in fault but Jim beleives all ISIs are locked or in damped
08-03-18 18:16 Robert to EX
08-03-18 18:17 Robert to EX to take pictures
08-03-18 18:18 Jim and Mark to EY to lock the ISI
08-03-18 18:23 Chandra to MY
08-03-18 18:43 Travis and Betsy to EY
08-03-18 19:00 Karen to MY
08-03-18 19:16 Jim to EX to start Pcal baffle install
08-03-18 19:38 Karen done at MY
08-03-18 19:43 Jim back from EY
08-03-18 19:49 Richard to EY to talk to Ken
08-03-18 20:21 Betsy and Travis back from EY
08-03-18 20:24 Robert to EY to take pictures
08-03-18 20:32 TJ, Sheila, Terry, Gerardo out of LVEA and HAM6 for lunch
08-03-18 20:45 Jim, Mark, and Niko, to EX to work on Pcal baffles
08-03-18 20:52 Dave and Fil hard cycling EY SUS, optic and TMS in damped
08-03-18 21:38 Richard and Fil swapping binary card at EY, after power cycle didnt fix
08-03-18 21:38 Kyle to EX to check on purge air, turn up
08-03-18 21:41 Chandra to MY
08-03-18 21:49 Dave testing a CS to EY connection, ETMY pitch
08-03-18 21:57 Terry heading to HAM6
08-03-18 22:01 Fil and Mark to MX to pull cable for new access system
08-03-18 22:05 Kyle back from EX
08-03-18 22:10 Matt to LVEA to take a picture
08-03-18 22:12 Nutsinee to HAM6
08-03-18 22:14 Dave has restored EY
08-03-18 22:17 Mark testing a table on HAM4
08-03-18 22:26 Matt to MY to look for IO 3IFO parts
08-03-18 22:32 Sheila to HAM6
08-03-18 22:45 TJ to HAM6
08-03-18 22:46 TJ to HAM6
08-03-18 22:53 Matt back from MY
08-03-18 22:56 TJ back from HAM6
08-03-18 23:08 Richard to LVEA with contractors
08-03-18 23:17 Roberts back from EY
08-03-18 23:54 crew still at HAM6
08-03-18 23:55 Jim and crew still at EX
08-03-18 23:58 Richard's contractor are probably still on site at MX