Reports until 16:00, Monday 12 March 2018
LHO General
corey.gray@LIGO.ORG - posted 16:00, Monday 12 March 2018 (40963)
DAY Operator Summary

TITLE: 03/12 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

Did not get to put a door on at EY.  Needed to reapply a new coat of First Contact.

Note on ETMx Alignment:

PCal group mentioned issues with ETMx alignment earlier in the day.  ETMx was in a DAMPED state and was pitched down and to the left.  I took ETMx Guardian to ALIGNED and this took care of most of the yaw, but it was still pitched down.  At this point I took the ETMx Pitch Alignment bias from:

51.6 to 96.6 urad.

Checking alignment of ALS to check ETMx (Keita).  And SUS group is also investigating.

LOG: