TITLE: 03/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
15:00 Rick, Travis and Niko to EX for in-chamber Pcal alignment.
15:02 Peter ad Jeff moving stuff into H2 Chiller enclosure
15:40 Peter and Jeff back from LVEA15:51 Fil out to EY for HV testing
16:01 Marc ro CER to repair squeezer Ethercat chassis WP# 7413
16:02 Hugh to EX mechanical room
16:09 Dan(HVAC) out of optics lab and heading to end stations.
16:10 Jason heading to EX to swap OpLev laser
16:18 Kim and Betsy to EY. Pulling first contact and if all goes well, locking ISI.
16:38 Rick, Travis and Niko back. Travis to EY to join Betsy.
16:40 Norco on site delivering LN2 to dewar 76 (CS-X)
16:57 Elizabeth heading out to outbuildings - delivering net switches/dressing cables/checking connectivity
17:00 Second LN2 delivery on site to dewar 72 (MY)
17:05 Jason back
17:26 Cheryl headed into the PSL
17:33 Marc out
17:35 N out to ISCT6.
17:49 Paradise water with delivery
17:50 M2 and Chris out of optics lab and out to EY to put BSC door on.
18:03 Karen to MY
18:20 Betsy ad Travis back
18:42 Corey out to optics lab/LVEA for tools
19:05 DAQ resart. Took OPO, ZMs ad OFI to SAFE state
19:07 Cheryl out for lunch
19:11 Corey and Elizabeth out for lunch
19:10 Returned all suspensions back to previous states
19:33 M2 done at EY and back. Door is on
19:49 Pepsi on site
19:55 Elizabeth back out to previous out-building tasks
19:56 Purge air work is over. Fil ad TJ out to HAM6
20:26 Jason out to PSL
20:29 Richard out to HAM6
20:30 Me to EX to center the OpLev
20:33 Richard back
20:34 Hugh out to EX
20:36 Cheryl back out to PSL
20:39 Chris out to ends moving SUS equipment
21:28 Betsy and Travis heading to EX
21:47 Hugh back
22:22 Jim out to EX
22:56 Jim back