Reports until 16:03, Tuesday 13 March 2018
H1 General
edmond.merilh@LIGO.ORG - posted 16:03, Tuesday 13 March 2018 (40983)
Shift Transition - Day

TITLE: 03/13 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

15:00 Rick, Travis and Niko to EX for in-chamber Pcal alignment.

15:02 Peter ad Jeff moving stuff into H2 Chiller enclosure

15:40 Peter and Jeff back from LVEA15:51 Fil out to EY for HV testing

16:01 Marc ro CER to repair squeezer Ethercat chassis WP# 7413

16:02 Hugh to EX mechanical room

16:09 Dan(HVAC) out of optics lab and heading to end stations.

16:10 Jason heading to EX to swap OpLev laser

16:18 Kim and Betsy to EY. Pulling first contact and if all goes well, locking ISI.

16:38 Rick, Travis and Niko back. Travis to EY to join Betsy.

16:40 Norco on site delivering LN2 to dewar 76 (CS-X)

16:57 Elizabeth heading out to outbuildings - delivering net switches/dressing cables/checking connectivity

17:00 Second LN2 delivery on site to dewar 72 (MY)

17:05 Jason back

17:26 Cheryl headed into the PSL

17:33 Marc out

17:35 N out to ISCT6.

17:49 Paradise water with delivery

17:50 M2 and Chris out of optics lab and out to EY to put BSC door on.

18:03 Karen to MY

18:20 Betsy ad Travis back

18:42 Corey out to optics lab/LVEA for tools

19:05 DAQ resart. Took OPO, ZMs ad OFI to SAFE state

19:07 Cheryl out for lunch

19:11 Corey and Elizabeth out for lunch

19:10 Returned all suspensions back to previous states

19:33 M2 done at EY and back. Door is on

19:49 Pepsi on site

19:55 Elizabeth back out to previous out-building tasks

19:56 Purge air work is over. Fil ad TJ out to HAM6

20:26 Jason out to PSL

20:29 Richard out to HAM6

20:30 Me to EX to center the OpLev

20:33 Richard back

20:34 Hugh out to EX

20:36 Cheryl back out to PSL

20:39 Chris out to ends moving SUS equipment

21:28 Betsy and Travis heading to EX

21:47 Hugh back

22:22 Jim out to EX

22:56 Jim back