Ops Shift Log: 03/15/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for maintenance and upgrades
Intent Bit: Engineering
Support: X
Incoming Operator: N/A
Shift Summary: Maintenance and upgrade work continues apace across the site.
Activity Log: Time - UTC (PT)
15:00 (08:00) Start of Shift
15:06 (08:06) Terry – Going into LVEA to work on Squeezer
15:14 (08:14) Vanessa – Going into the LVEA for cleaning
15:58 (08:58) Hugh & Betsy – Going to HAM6 to talk to Squeezer folks
16:06 (09:06) TJ – Going to HAM6
16:12 (09:12) Jason & Ed – Going into PSL Enclosure to work on 70W alignment
16:26 (09:26) Gerardo – Into the LVEA looking for a septum cover
16:34 (09:24) Hugh & Corey – Unlocking and balancing HAM6 tables
16:45 (09:45) Jeff K. – Going to HAM6 area
16:45 (09:45) Gerardo – Out of the LVEA
16:46 (09:46) TJ – Out of the LVEA
16:46 (09:46) Marc – Going to CER and PSL rack (WP #7419)
16:47 (09:47) Nutsinee – Going to HAM6 area
17:04 (10:04) Pepsi on site to service vending machines
17:06 (10:06) Nutsinee – Out of the LVEA
17:10 (10:10) Peter & Arijit – Peter escorting Arijit into PSL Enclosure
17:32 (10:32) Filiberto – Into LVEA and Mechanical building cabling for TCS Beckhoff
17:50 (10:50) Dave – Going to H2 Electronics building
18:00 (11:00) Marc – Out of the LVEA
18:15 (11:15) Georgia – Turning on TCS- X and TCS-Y Lasers
18:22 (11:22) Richard – Going to HAM6 to talk with Hugh
18:26 (11:26) Karen – Cleaning in the H2 building
18:40 (11:40) Peter & Arijit – Out of the PSL Enclosure
18:47 (11:47) Jason & Ed – Out of the PSL Enclosure
19:01 (12:01) Karen – Out of the H2 building
19:20 (12:20) Elizabeth – Going to both mid and end stations to work on network switches
20:54 (13:54) Elizabeth – Back from mid and end stations
20:58 (13:58) Greg – Going to work on TCS-X laser table
21:00 (14:00) Jason & Ed – Into the PSL Enclosure for mode matching work
21:00 (14:00) Cheryl – Going into the PSL Enclosure to modify ISS dog clamps (WP #7421)
21:08 (14:08) Betsy – Going into the LVEA to look for parts
21:30 (14:30) Betsy – Out of the LVEA
21:40 (14:40) Marc – Back into LVEA to work on RF90 cable
21:57 (14:57) Jason – Out of the PSL Enclosure
22:00 (15:00) End-Y being transitioned to laser hazard
22:08 (15:08) Lockout/Tagout lock in Bubba’s name on End-Y PCal laser. Spoke with Bubba – He gave verbal permission for the PCal crew to remove his lock. Notified Darkhan by phone of same.
22:21 (15:21) End-Y has been returned to laser safe. Lockout/Tagout has been restored to its original condition.
22:40 (15:40) PCal crew back from End-Y
22:55 (15:55) Jeff K. – Out to talk with HAM6 SEI crew
23:00 (16:00) End of Shift