Reports until 15:17, Monday 19 March 2018
H1 SUS
travis.sadecki@LIGO.ORG - posted 15:17, Monday 19 March 2018 (41065)
ETMx Quad removal prep

Today, Betsy and I prepped the ETMx Quad for removal of the lower structure tomorrow.  We swung back ACB, locked down all optics and masses, and disconnected all cables and wire segment necessary for removal of the lower structure.  We are in good shape for extraction from chamber tomorrow morning.