Reports until 08:05, Wednesday 21 March 2018
LHO General
thomas.shaffer@LIGO.ORG - posted 08:05, Wednesday 21 March 2018 (41091)
Ops Day Shift Transition

TITLE: 03/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.22 μm/s
QUICK SUMMARY: Peter is in the PSL, Mark and Mark are test fitting the platform on HAM6 HEPI