Displaying report 1-1 of 1.
Reports until 16:15, Tuesday 14 December 2010
H2 INS
corey.gray@LIGO.ORG - posted 16:15, Tuesday 14 December 2010 (411)
BSC6 SEI Deinstal Staging
(Corey, Hugh, Mitchell, Rodney, Zach)

Today, we did the following:
* Top of the cleanroom was cleaned (it was not very dirty, since everything on top was newly-installed)
* Old Cleanroom roof/sock was removed
* Top of the BSC6 Dome was wiped down
* Big BSC6 cleanroom roof/sock was installed
* Made a fit check of the spreader bar on the BSC Dome lifting eyes.

To get access to the top of the cleanroom/BSC Dome, Mitch was attached to the crane via fall-arrest rigging.  To get to the top of the cleanroom, we needed to bring out the blue manlift.

Waiting for powers that be to sign-off on the BSC De-install Hazard Analysis/Procedure, and then we can proceed (as long as tumbleweeds don't prevent access to MY).
Displaying report 1-1 of 1.