(Corey, Hugh, Mitchell, Rodney, Zach) Today, we did the following: * Top of the cleanroom was cleaned (it was not very dirty, since everything on top was newly-installed) * Old Cleanroom roof/sock was removed * Top of the BSC6 Dome was wiped down * Big BSC6 cleanroom roof/sock was installed * Made a fit check of the spreader bar on the BSC Dome lifting eyes. To get access to the top of the cleanroom/BSC Dome, Mitch was attached to the crane via fall-arrest rigging. To get to the top of the cleanroom, we needed to bring out the blue manlift. Waiting for powers that be to sign-off on the BSC De-install Hazard Analysis/Procedure, and then we can proceed (as long as tumbleweeds don't prevent access to MY).