Reports until 16:03, Thursday 22 March 2018
H1 General
edmond.merilh@LIGO.ORG - posted 16:03, Thursday 22 March 2018 (41106)
Shift Summary - Day

TITLE: 03/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

13:36 Peter into PSL

14:30 M2 (aka Itchy & Scratchy) @ MY VEA

14:38 Jeff B out to EY/EX for photos, reinstall dust monitors for vent and rodent checks - contamination control

15:13 King Soft on site

16:40 Bubba out to EY - to the well

16:40 Jeff B back from Ends and heading out to LVEA

16:50 Betsy and Travis out to EX

16:55 Jeff B back

17:23 Kyle, with Apollo, arrived on site

17:24 Sheila, Arijit and Terry out to HAM6

17:33 Jeff B to ITMY for camera work

17:44 Mark out to LVEA

17:56 Marc back

18:31 Chandra out to MY

18:44 Betsy and Travis back

18:45 Peter out to PSL

18:55 Jeff B back from ITMY - LSO must be informed before transition to LASER HAZARD as the cover is OFF the viewport

20:35 Jeff B out to LVEA

21:08 Betsy and Travis back out to EX

21:45 Peter back

22:09 Jeff B back for the day