Vac - Chevron baffle work take place Monday contigent on proper valves come in tomorrow.
Sus - New acoustic mode damping device to be installed on ETMY after successful testing at LLO.
Sei - EX; H6 ISI remained locked. EY;EX;H6 HEPI remained locked. TJ reports guardian code is finished.
CDS ELE - POP90 issue still under investigation. Access System workers still working. ISS outer loop chassis to be installed either this afternoon or tomorrow.
PSL - Mode matching after 70W amp to drive back into the AOM/PMC beam path.
Bubba - Work Safely