TITLE: 03/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
15:10 Jeff into CER
15:14 Jeff out of CER
15:16 Corey transitioning LVEA to laser safe
15:20 Karen to EY
15:28 Hugh out to LVEA - HAM6
15:29 Thomas and Patrick to mezzanine - TCS chillers
15:39 LVEA transitioned to LASER SAFE
15:41 Thomas and Patrick back
15:47 Corey out to LVEA - HAM6
15:54 Chris to MX to bring scaffolding
16:05 Hugh called from HAM6 to report that the workstation isn't functioning properly
16:19 Peter out
16:20 Terry into optics lab
16:36 M2 out to MY
16:42 Peter out to PSL
17:00 Paused LASER_PWR and IMC_LOCK nodes for Peter
17:09 Chris back and into optics lab
17:19 Chris back
18:10 Jeff headed out to EY
18:21 Peter out for lunch
18:45 Cheryl and guest out
18:52 Corey out of HAM6
19:15 Corey, Terry, Hugh, and Sheila out for lunch
19:21 Jeff B out for lunch
19:30 Sheila is transitioning to LASER Hazard
19:36 Betsy and Travis back for lunch
20:13 Jeff back to EY
20:13 Jenne and Sheila to HAM6
20:27 Betsy and Travis out to EX
20:37 M2 to MY
20:53 Fil out to LVEA by PSL racks
21:06 Jeff back
21:43 Fil out and heading to EX
22:15 Fil back