Kyle, Chandra
I think we set a new record for valve replacement. Replaced 10" valve today at X-beam manifold turbo station. Will leak check turbo side tomorrow and beam tube side after IP6 valve is replaced and XBM pumped back down later this week.
We had to cut away some of the vinyl floor around the turbo station framing in order to slide it around on concrete.