Reports until 11:10, Tuesday 27 March 2018
H1 General
edmond.merilh@LIGO.ORG - posted 11:10, Tuesday 27 March 2018 - last comment - 16:04, Tuesday 27 March 2018(41159)
Shift Summary - Day

Morning subbing for Niko while he does some PCal work:

14:40 Jeff B ou to LVE to remove house vacuum system

 14:53 M2 installing platform at HAM6

15:47 Norco on site with LN2 delivery - xxxxx75

15:50 Marc out to LVEA  - PSL & HAM6 rack area

15:55 Richard ou to LVEA

15:45 Peter and Carlos out to PSL to replace a computer in the enclosure

15:56 Hugh out to HAM6

16:00 Travis out to EX

16:21 Richard out to LVEA

16:27 Richard out

16:38 Karen to EY ad then MY

16:45 Cintas on site

16:47 Nutsinee out to Squeezer table to retrieve serial number

16:50 Peter and Carlos out

16:52 N back

16:53 Betsy, Slawek and Sebastian out to EY

17:13 Carlos out to LVEA - PSL area

17:15 Terry out to Squezer table

17:21 Terry back

17:22 Betsy back and out to EX.

17:23 LVEA is LASER HAZARD

17:27 Paradise Water on site

17:30 TJ out to HAM6 to work with Hugh

17:37 Carlos out

17:49 Karen leaving EY for CS

18:04 Fil back

18:09 Hugh back

18:10 Niko back

Comments related to this report
yannick.lecoeuche@LIGO.ORG - 16:04, Tuesday 27 March 2018 (41167)

Filling in the beginning/end of the day:

 

TITLE: 03/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC

STATE of H1: Planned Engineering

INCOMING OPERATOR: None

 

LOG:

 

14:40 (7:40) Bartlett in LVEA -- remove house vacuum system

14:53 (7:53) M&M to HAM6 -- installing platform on southside

15:00 (8:00) Start of shift

15:35 (8:35) Chris to mid and end stations

16:00 (9:00) Shift covered by Ed

18:10 (11:10) Back in the control room

18:19 (11:19) Bartlett out of LVEA

18:28 (11:28) Chandra to MY

18:59 (11:59) H1 hardware injection upgrade starting

19:20 (12:20) Travis, Betsy, Stephen, Angus, Jason back from EX for lunch

19:56 (12:56) TJ out of LVEA

20:10 (13:10) Sheila, TVo, Daniel, Alexei to LVEA -- adjust mode cleaner optics

20:12 (13:12) Ed to HAM6 -- hooking up wires

20:15 (13:15) Marc to EX, EY -- work on RF cabling

20:20 (13:20) Slawek, Sesbatian, Betsy to EY

20:21 (13:21) Sheila, TVo, Daniel, Alexei out of LVEA

20:39 (13:39) Jason Stephen Angus Travis to EX -- fiber welding

21:14 (14:14) Peter to PSL enclosure

21:33 (14:33) Marc back from end stations

21:42 (14:42) Terry to ISCT6

22:43 (15:43) Chandra to MY

22:53 (15:53) Peter out of PSL

23:00 (16:00) End of shift