jodi.fauver@LIGO.ORG - posted 15:35, Thursday 06 September 2012 (4119)
X-end
Scott, Mark L. and I spent time preparing for ICC at BSC9. Scott and Mark dealt with cleanroom location, assembly, and repair issues. They also moved the flam cabinet from the emergency exit air-lock into the VEA. I cleaned up from the iLIGO optics de-install, organized garbing and staging materials, packed up unneeded items, etc. Two large staging tables were returned to the corner station so they could be used for work at HAM1 and HAM4.