14:00 UTC Chris S. traveling both arms to assess tumbleweed blockage 14:30 UTC Chris S. finished. Both arms are clear for travel. 15:07 UTC Rick to PSL enclosure. Peter already there. 15:13 UTC Chandra to LVEA 15:30 UTC Nutsinee to HAM6, squeezer table 15:44 UTC APS on site (new access control system install) 16:00 UTC Morning meeting in control room 16:33 UTC Jeff B. starting transition of LVEA to laser safe 16:33 UTC Tyler and Mark to end Y to drop off IP valve 16:47 UTC Sheila to LVEA to help Jeff B. transition to laser safe 17:02 UTC Jeff B. done transitioning LVEA to laser safe 17:07 UTC Jeff B. to LVEA to remove old dust monitor air lines 17:11 UTC Gerardo to end Y to prep for IP/CHEV/GV install 17:15 UTC Kyle running crane 17:21 UTC Thomas taking Sebastian on tour of LVEA 17:24 UTC Mark, Tyler and Bubba inspecting HAM5 for door removal. Then Mark, Tyler to work on IP6. 17:30 UTC Travis and Betsy to end X to pick up bin then to end Y to work in chamber 17:32 UTC Sheila to optics lab 17:56 UTC Jeff K. done running measurements on HAM5 SUS 17:58 UTC Truck from Apollo through gate to see Bubba 18:03 UTC Jeff B. done in LVEA 18:19 UTC Karen to mid Y 18:20 UTC Sheila back 18:33 UTC Gerardo back 18:35 UTC Filiberto pulling cables over HAM5 and HAM6 (WP 7451) 18:55 UTC Karen leaving mid Y Mark and Tyler back for lunch 19:09 UTC Visitor to meet Jenne through gate 19:26 UTC Filiberto out of LVEA 19:31 UTC Thomas to LVEA to retrieve equipment 19:46 UTC Jenne taking visitor on tour through LVEA 19:57 UTC Betsy and Travis back from end Y 20:11 UTC Marc to vault power room (WP 7452) 20:12 UTC Jenne and visitor out of LVEA 20:13 UTC Rick and Peter out of PSL enclosure 20:18 UTC Mark and Tyler to LVEA to install IP5 20:56 UTC Jeff B. to LVEA to run zero count and flow tests on dust monitors 21:23 UTC Terra and Thomas to electronics bay to calibrate SR3 ring heater 21:26 UTC Jeff B. done in LVEA. Moving to optics lab and diode room. 21:44 UTC Betsy and Travis to end X 21:55 UTC Jason to PSL enclosure 21:56 UTC Marc back from vault power room 22:00 UTC Gerardo to end Y to continue gate valve removal 22:04 UTC Jeff B. to end stations to test dust monitors 22:10 UTC Terra and Sebastian to LVEA to look for spare mirrors in cabinet by ITMX 22:26 UTC Mark and Tyler done at IP5. Dropping off gaskets at end Y then leaving site. 22:39 UTC Terra and Sebastian back 22:41 UTC Chandra to end Y 22:54 UTC Jeff B. done