Reports until 16:17, Monday 02 April 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:17, Monday 02 April 2018 (41254)
Ops Shift Summary
14:00 UTC Chris S. traveling both arms to assess tumbleweed blockage
14:30 UTC Chris S. finished. Both arms are clear for travel.
15:07 UTC Rick to PSL enclosure. Peter already there.
15:13 UTC Chandra to LVEA
15:30 UTC Nutsinee to HAM6, squeezer table
15:44 UTC APS on site (new access control system install)
16:00 UTC Morning meeting in control room
16:33 UTC Jeff B. starting transition of LVEA to laser safe
16:33 UTC Tyler and Mark to end Y to drop off IP valve
16:47 UTC Sheila to LVEA to help Jeff B. transition to laser safe
17:02 UTC Jeff B. done transitioning LVEA to laser safe
17:07 UTC Jeff B. to LVEA to remove old dust monitor air lines
17:11 UTC Gerardo to end Y to prep for IP/CHEV/GV install
17:15 UTC Kyle running crane
17:21 UTC Thomas taking Sebastian on tour of LVEA
17:24 UTC Mark, Tyler and Bubba inspecting HAM5 for door removal. Then Mark, Tyler to work on IP6.
17:30 UTC Travis and Betsy to end X to pick up bin then to end Y to work in chamber
17:32 UTC Sheila to optics lab
17:56 UTC Jeff K. done running measurements on HAM5 SUS
17:58 UTC Truck from Apollo through gate to see Bubba
18:03 UTC Jeff B. done in LVEA
18:19 UTC Karen to mid Y
18:20 UTC Sheila back
18:33 UTC Gerardo back
18:35 UTC Filiberto pulling cables over HAM5 and HAM6 (WP 7451)
18:55 UTC Karen leaving mid Y
Mark and Tyler back for lunch
19:09 UTC Visitor to meet Jenne through gate
19:26 UTC Filiberto out of LVEA
19:31 UTC Thomas to LVEA to retrieve equipment
19:46 UTC Jenne taking visitor on tour through LVEA
19:57 UTC Betsy and Travis back from end Y
20:11 UTC Marc to vault power room (WP 7452)
20:12 UTC Jenne and visitor out of LVEA
20:13 UTC Rick and Peter out of PSL enclosure
20:18 UTC Mark and Tyler to LVEA to install IP5
20:56 UTC Jeff B. to LVEA to run zero count and flow tests on dust monitors
21:23 UTC Terra and Thomas to electronics bay to calibrate SR3 ring heater
21:26 UTC Jeff B. done in LVEA. Moving to optics lab and diode room.
21:44 UTC Betsy and Travis to end X
21:55 UTC Jason to PSL enclosure
21:56 UTC Marc back from vault power room
22:00 UTC Gerardo to end Y to continue gate valve removal
22:04 UTC Jeff B. to end stations to test dust monitors
22:10 UTC Terra and Sebastian to LVEA to look for spare mirrors in cabinet by ITMX
22:26 UTC Mark and Tyler done at IP5. Dropping off gaskets at end Y then leaving site.
22:39 UTC Terra and Sebastian back
22:41 UTC Chandra to end Y
22:54 UTC Jeff B. done