Reports until 15:06, Tuesday 03 April 2018
H1 SEI (CDS)
filiberto.clara@LIGO.ORG - posted 15:06, Tuesday 03 April 2018 (41265)
BSC3 CPS Box - Strained Connector

WP 7455

Removal of temporary cabling under work permit 7455 is now complete. We took extra precaution when pulling around feedthroughs and decided to cut the end connector to make pulling of the cables easier. One of the CPS units on BSC3 had a cable that was causing strain on the one of the board connectors. Cable was redressed to relieve strain on the connector but maybe SEI team can look at the CPS signals.

F. Clara, E. Merilh