Ops Shift Log: 04/03/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for upgrade vent
Intent Bit: Engineering
Support: X
Incoming Operator: N/A
Shift Summary: PSL 70W alignment; Vacuum work in the LVEA; Suspension work at End-X; Commissioning work in the LVEA and control room.
Activity Log: Time - UTC (PT)
13:25 (06:25) Peter – Into the PSL Enclosure
14:15 (07:15) Apollo crew – Moving HAM4 cleanroom (WP #7453)
15:00 (08:00) Start of shift
15:15 (08:15) Chris – Escorting pest control on site – Will spray at LSB
15:23 (08:23) HAM4 cleanroom move complete
15:30 (08:30) Marc – Going into LVEA to change mounting nuts on several chassis
15:34 (08:34) Pest Control finished in LVEA – Going to do the arms
15:35 (08:35) Richard & Filiberto – Going to CER and LVEA floor
15:42 (08:42) Apollo & Chandra – Going to End-Y
15:43 (08:43) Port-a-Potty service on site
16:15 (09:15) Chris & Pest Control – Finished at End-X
16:17 (09:17) Norco on site to deliver N2 to CP-5
16:19 (09:19) Marc – Out of the LVEA
16:20 (09:20) Transition LVEA to Laser Hazard
16:28 (09:28) Jason & Sabastian - Going into the PSL Enclosure
17:03 (10:03) Norco – On site to deliver N2 to CP-3
17:05 (10:05) Terry & Nutsinee – Going to HAM5/6
17:10 (10:10) Dave – Restarting H1SUSH2B to fix errors
17:25 (10:25) Peter – Out of the PSL Enclosure
17:31 (10:31) Washington Crane – Working on crane in High Bay
18:08 (11:08) Betsy & Travis – Going to End-Y
18:14 (11:14) Sheila – Going to HAM5/6
18:30 (11:30) Ed – Out of the LVEA
19:02 (12:02) Jason & Sabastian – Out of the LVEA
19:08 (12:08) Dave – DAQ restart for Beckhoff channel changes
19:37 (12:37) Dick – Going to ISC rack
19:38 (12:38) Filiberto – Out of the LVEA
19:53 (12:53) Marc – Going back into the LVEA
20:17 (13:17) Filiberto – Going into the LVEA to remove old cable
20:20 (13:20) Sheila, Terry, and Nutsinee – Out of the LVEA
20:21 (13:21) Pest Service finished and leaving the site
20:22 (13:22) Ed – Going into the LVEA to work with Filiberto
20:35 (13:35) Dave – DAQ restart for ISS and Squeezer
21:00 (14:00) Keita – Going to HAM6
21:06 (14:06) Peter, Rick, Jason, & Sabastian – Going back into the PSL Enclosure
21:10 (14:10) Sheila – Going to HAM6
21:26 (14:26) Filiberto – Out of the LVEA
21:28 (14:28) Jim – Going to End-Y
21:34 (14:34) Betsy – Going into the Optics Lab
21:40 (14:40) Chandra – Going to Mid-X and possibly Mid-Y
21:52 (14:52) Rick – Going into the PSL Enclosure
21:58 (14:58) Dick & Marc – Out of the LVEA
22:27 (15:27) Dick & Marc – Going back into LVEA to work at the ISC rack
22:41 (15:41) Sheila, Terry, & Nutsinee – Out of the LVEA
22:48 (15:48) Terry & Nutsinee – Going back to HAM5/6
23:00 (16:00) End of Shift