Ops Shift Log: 04/12/2018, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: X
Incoming Operator: N/A
Shift Summary: Vent and commissioning across the site
Activity Log: Time - UTC (PT)
14:36 (07:36) Hugh – Going to HAM6 to balance the ISI
15:00 (08:00) Start of shift
15:05 (08:05) Richard – Escorting contractor in LVEA
15:31 (08:31) Karen – Cleaning at End-Y
15:36 (08:36) Filiberto – Going to ISC rack to terminate new cables
15:40 (08:40) Richard – Out of the LVEA
15:53 (08:53) S&K Elec – Working in and around MSR
16:06 (09:06) Sheila – Going to HAM5
16:11 (09:11) Nutsinee – Going to HAM5
16:20 (09:20) Peter – Out of the PSL Enclosure
16:21 (09:21) Filiberto – Out of the LVEA
16:25 (09:25) Karen – Finished at End-Y
16:35 (09:35) Calum & Travis – Going to End-X to work on ETM
16:58 (09:58) Chandra – Going into the LVEA
17:00 (10:00) Richard & Filiberto – Going to Mid-Y and End-X
17:01 (10:01) Jamie – Guardian upgrade testing – Taking nodes up and down
17:02 (10:02) Betsy – Going to End-X
17:05 (10:05) Hugh – Out of LVEA
17:18 (10:18) Richard – Out of the LVEA
17:25 (10:25) Filiberto – Finished at Mid-Y
17:25 (10:25) Filiberto – Going to End-X to pull cable for ele field meter
17:30 (10:30) Rich A. – Going into LVEA to retrieve a power meter
17:42 (10:42) Rich A. & Louis – Going to End-X for ele field meter
18:12 (11:12) Hugh – Going into the LVEA to put away parts
18:26 (11:26) Aiden & TV – Going into the CER
18:39 (11:39) Karen – Cleaning in the H2 electronics building
18:42 (11:42) Filiberto – Back from End-X
18:54 (11:54) Peter & Koji – Going into the PSL enclosure
18:58 (11:58) Karen – Out of the H2 electronics building
19:37 (12:37) Terry – Going to HAM6
20:26 (13:26) Peter & Koji – Out of the PSL enclosure
20:35 (13:35) Filiberto – Turn on High Voltage at End-Y
20:50 (13:50) Filiberto – Finished at End-Y
20:53 (13:53) Georgia & Craig – Going to End-X to assist with EFM install
21:35 (14:35) Peter & Koji – Going back into the PSL Enclosure
21:41 (14:41) Cheryl – Going into PSL enclosure to take pictures and measurements
21:48 (14:48) Sheila – Going to HAM6
22:44 (15:44) Sheila & Terry – Out of the LVEA
22:55 (15:55) Aidan – Going to HAM4 to check on spares
23:00 (16:00) End of Shift