T Vo, Sheila
Attached is a screenshot for which PRX and the Michelson are roughly aligned. We still need to aling the RMs to get light on REFL.
Our next steps towards locking DRMI are:
- to set darkoffsets on the AS WFS, and
- using the swinging michelson phase the AS WFS so that the michelson signal is in the Q phases. We can try this for both 9Mz and 45Mz to get an idea of how we should set the phases for the REFL and POP sensors as well.
- Then we should be able to lock the michelson and fine tune the 45MHz phase
- Attempt to lock PRX to align PRM
- Align onto the LSC POP and REFL diodes
- Attempt to align and lock PRMI