Morning Meeting:
Morning Meeting:
Jeff Jones started today
APS contractor for access system starts install today, any questions, call Richard
a considerable number of Front Ends require rebooting, which is planned for this week
CS:
HAM6: JeffK and TJ on VOPO alignment
SQZ: Terry, Sheila, Nutsinee, activities around HAM6
HAM6/SQZ: TVo, Sheila, OMC alignment loops closed yesterday
VAC: Chandra, Bubba, crew, moving IMC cleanroom, requires craning, laser safe
SR2 CO2 laser: still residing in the SQR bay, no im
PSL: Jason, Peter, mode matching to the PMC
PSL: Jason, Peter, Rick, PMC swap planned for sometime in the next 1-2 weeks
EOM: Sigg, Sheila, RF needs attention, unknown timeframe
LVEA: transitioning to Laser Safe in the AM, back to laser hazard later today
EY:
ALS: Richard, Fil, work continues
SUS: JeffK has measured bounce and roll
ALS and PCAL: plan to turn green and pcal beams on, sometime next couple weeks
EX:
SUS: Travis, Tyler, MarkD, staging for EX repairs
PEM: Olivia, others, field measurements continue, instrument is in the chamber, access into the chamber is periodic
VAC: Chandra, crew, turbo pump valve and IP12 valve swap, requires some craning